In 1995 and 1996, I built a Bastidon in Provence (South of France). The project had 21 tasks (2 tasks canceled), it was planned for a duration of 33 man-day, realized in 47 man-day, used 5 m³ of concrete, 2000 kg of ciment, 300 rubble stone, 8 m³ of sand and gravel and about 100 kg of iron. All the details are defined in the document Bastidon Lou Mistraou.

Fondations

Bastidon fondations.jpg Bastidon dammage.jpg

Dalle du bastidon

Bastidon bas murs.jpg

Murs

Bastidon murs.jpg Bastidon cintrage.jpg Bastidon betonnage.jpg Bastidon coffrage.jpg

Toit et Crepi